EDU Chain is being sunset, bridge assets to Arbitrum before 23 December 2026
Open Campus announced on 2 October 2026 that EDU Chain is being sunset as a standalone network, with a deadline of 23 December 2026 for users to bridge their assets back to Arbitrum One. Assets still on EDU Chain after that date will no longer be accessible. Open Campus has not published the exact time block production stops.
EDU Chain launched its mainnet in January 2025 as a layer 3 for education built on Arbitrum, backed by an Arbitrum Foundation grant, with EDU as its gas token. Open Campus is moving to a multichain model across Base, Arbitrum, Moca Chain and Ethereum. The EDU token continues on BSC, Ethereum and Arbitrum and is being brought to Base.
Before bridging, close any Sailfish liquidity positions and unstake and unwrap WEDU to EDU. Then bridge EDU, USDC and USDT with the official Arbitrum bridge, keeping about 0.0001 EDU per bridging transaction for gas and a small amount of ETH on Arbitrum for the claim. Settlement takes about a day, so do not leave it to the final week. Open Campus ID credentials are migrated automatically to AIR infrastructure and Moca Chain, so holders do not need to do anything for them.
Other tokens and NFTs issued on EDU Chain, such as EDDY and MOGA, can only be moved by their own project teams, so holders should follow those teams' instructions. LayerZero support for EDU Chain already ended on 28 August 2026.
What users need to do
Before 23 December 2026: close any Sailfish liquidity positions, unstake and unwrap WEDU to EDU, then bridge EDU, USDC and USDT from EDU Chain to Arbitrum One with the official Arbitrum bridge, keeping about 0.0001 EDU per bridging transaction for gas and a little ETH on Arbitrum for the claim. Settlement takes about a day and must be claimed on Arbitrum, so do not wait until the last week. Assets left on EDU Chain after the deadline become inaccessible. Holders of other EDU Chain tokens or NFTs (such as EDDY or MOGA) must follow their project teams.
Where it goes: Assets return to Arbitrum One via the canonical Arbitrum bridge; EDU continues on BSC, Ethereum and Arbitrum and is being brought to Base via LayerZero OFT. Open Campus ID credentials migrate automatically to AIR infrastructure and Moca Chain. dApps are encouraged to move to Base.
Timeline
- Mainnet launchJanuary 2025 · 23 months ago
- Support ends28 August 2026 · 3 months ago
- Announced2 October 2026 · 49 days ago
- Withdrawal deadlineNEXT23 December 2026 · in 33 days
Key facts
- EDU Chain is sunsetting; holders of EDU, USDC or USDT on EDU Chain must bridge them to Arbitrum before 23 December 2026 or lose access. (Open Campus Medium post, 2 Oct 2026)
- Bridging uses the official Arbitrum bridge, takes about a day to settle and needs a claim transaction paid in ETH on Arbitrum; WEDU must be unstaked and unwrapped first; Sailfish LP positions should be closed via a withdrawal-only interface. (Open Campus Medium post)
- EDU on BSC, Ethereum and Arbitrum is unaffected and EDU will be brought to Base via OFT and LayerZero; credentials move to AIR infrastructure and Moca Chain automatically. (Open Campus Medium post)
- EDU Chain launched as the first layer 3 for education with an Arbitrum Foundation grant in July 2024; mainnet went live in January 2025. (Open Campus Medium post)
- EDU Chain and Open Campus X accounts posted the 23 December 2026 bridge deadline on 2 October 2026. (X posts by @educhain_xyz and @opencampus_xyz)
- LayerZero support for EDU Chain ended on 28 August 2026 (USDC.e holders told to move off). (X post by @educhain_xyz, 24 Jul 2026)
- Chain id 41923, native currency EDU, Gelato RaaS listing. (ethereum-lists/chains eip155-41923.json)